Background Image
Table of Contents Table of Contents
Previous Page  971 / 1278 Next Page
Information
Show Menu
Previous Page 971 / 1278 Next Page
Page Background

Products designed for industrial applications.

General terms and conditions for sale are available on

www.camozzi.com.

3

Series MC soft start valves

TREATMENT >

CATALOGUE

>

Release 8.8

/2.35.03

3

TREATMENT

Pressurisation times as to the n° of turns of the regulation screw,

with downstream volume of 5 litres. A = 5 turns - B = 4 turns

- C = 3 turns - D = 2 turns - E = 1 turn. “K” = n° of turns of the

regulation screw required to obtain the required pressurisation

time with an inlet pressure of 6 bar. Variations of the inlet

pressure can cause deviations of the pressure time by ± 20%. K

= t/V where: V = volume of the downstream system in litres; t =

desired pressuring time in seconds.

Pressurisation times as to the n° of turns of the regulation screw,

with downstream volume of 5 litres. A = 9 turns - B = 7 turns - C =

5 turns - D = 3 turns - E = 1 turn. “K” = n° of turns of the regulation

screw required to obtain the required pressurisation time with an

inlet pressure of 6 bar. Variations of the inlet pressure can cause

deviations of the pressure time by ± 20%. K = t/V where: V =

volume of the downstream system in litres; t = desired pressuring

time in seconds.

DIAGRAMS FOR PRESSURISATION TIMES

Example: MC104-AV

V = 5 litres

t = 16 seconds

K = 16/5 = 3,2

g = number of turns

Using in the graph this value K, the number of turns of the

regulation screw will be approx. 1,8.

Example: MC238-AV - MC202-AV

V = 5 litres

t = 16 seconds

K = 16/5 = 3,2

g = number of turns

Using in the graph this value K, the number of turns of the

regulation screw will be approx. 1,8.

VARIATION IN PRESSURISATION - Example